Notes |
04/27/13: On the quilt wall, awaiting selection and placement of the corner squares for the sashing.
04/28/13: Corner squares placed, now on to cutting out sashing.
05/04/13: Main quilt top done. Border 1 going on next. Border 2 makes me nervous.
05/17/13: Top done. Now to pick out back/border and get it on the frame for quilting.
07/12/13: Went to load it into the frame to quilt and discovered that the sheet I'd bought for the back is too small. :-/ Do I get another sheet? Or pony up for actual fabric. It's 67x95". That's going to take almost 6 yards of regular width fabric. Decisions...
07/15/13: Ordered 110" backing fabric, so it only took 2 yards. Woo! Went with something COMPLETELY different (big black and white daisies!) because I always like that look on a quilt. May jump something else in the queue while I wait for my order to arrive. So exciting! |